Runcorn

Image Gallery

Project Information


Contract Value: Withheld

Programme: 11 weeks

Location: Preston Brook Cheshire


Working closely with our client, we completly refurbished the Office corridor area to create new glazed front offices, installed within structural load bearing walls. Through ongoing designs we created new Boardrooms and Meeting Rooms originally omitted from the project as well as new Toilets and Kitchen space. Complete new Cat 6 data cabling installed along with lighting and power.

Works Included


  • Structural Alterations to form openings in load bearing walls, removal of walls and installation of steel lintels and supports.
  • Removal of Staircase and Infill floor for more office space
  • Strip out of Partitions, ceilings and existing services
  • Stud and Glazed partitions
  • Suspended and Plasterboard ceilings
  • Lighting, Power and Data
  • Tea Point including Zip water taps
  • Toilet cubicles, Panel Ducting and Vanity units with Corian tops
  • W.C Re-fit
  • Flooring
  • Decorations